CAPM flashcards: terms, formulas and look-alike concepts

These CAPM® flashcards cover the formulas, terms and look-alike pairs that run through all four domains of PMI®’s 2023 outline, with the answer printed on the back of each card. They are written from the outline’s topics and standard project management practice, and when a card needs a longer explanation the cost and schedule variance and WBS and critical path pages pick up where it stops.

Reviewed October 30, 2026

The deck: formulas, scheduling, roles, agile and analysis

Formulas come first, then scheduling, risk and roles, agile, and business analysis. Answer out loud before opening a card. If the answer comes out as a paragraph, the card goes back in the pile.

  • Card 01Cost variance (CV): formula and reading

    CV = EV − AC. Negative means over budget, positive means under.

  • Card 02Schedule variance (SV): formula and reading

    SV = EV − PV. Negative means behind schedule.

  • Card 03Cost performance index (CPI)

    CPI = EV / AC. Below 1.0, each dollar spent is buying less than a dollar of planned work.

  • Card 04Schedule performance index (SPI)

    SPI = EV / PV. Below 1.0, work is being completed more slowly than planned.

  • Card 05Estimate at completion (EAC) if current cost performance continues

    EAC = BAC / CPI, where BAC is the budget at completion.

  • Card 06PV, EV and AC, one line each

    Planned value: budgeted cost of the work scheduled to date. Earned value: budgeted cost of the work actually done. Actual cost: what that work really cost.

  • Card 07Critical path

    The longest chain of dependent activities through the schedule network. It sets the shortest possible project duration, and its activities normally have zero total float.

  • Card 08Total float vs free float

    Total float: how long an activity can slip without moving the project end date. Free float: how long it can slip without delaying the next activity.

  • Card 09Milestone

    A significant point or event with zero duration. Activities take time; a milestone marks that something is finished.

  • Card 10Crashing vs fast tracking

    Crashing adds resources to critical-path activities and usually adds cost. Fast tracking overlaps activities planned in sequence and usually adds risk.

  • Card 11Work breakdown structure (WBS) and the 100% rule

    The WBS decomposes the whole scope into deliverables, down to work packages at the lowest level. The 100% rule: each element’s children add up to all of its work and nothing outside it.

  • Card 12Risk vs issue

    A risk is uncertain and in the future; it goes in the risk register. An issue is happening now; it goes in the issue log.

  • Card 13Assumption vs constraint

    An assumption is taken as true for planning without proof. A constraint is a known limit, such as a fixed budget, date or resource.

  • Card 14Responses to a threat

    Avoid, transfer, mitigate, accept, escalate.

  • Card 15Responses to an opportunity

    Exploit, share, enhance, accept, escalate.

  • Card 16Project vs program vs portfolio

    Project: temporary effort, unique result. Program: related projects managed together for benefits they would not deliver separately. Portfolio: projects, programs and operations grouped to meet strategic objectives.

  • Card 17RACI letters

    Responsible does the work. Accountable owns the result, one person per task. Consulted gives input before. Informed hears after.

  • Card 18Tuckman’s stages of team development

    Forming, storming, norming, performing, adjourning.

  • Card 19Push, pull and interactive communication

    Push: sent to recipients, such as email or a memo. Pull: recipients fetch it from an intranet or repository. Interactive: real-time exchange, such as meetings and calls.

  • Card 20Scrum accountabilities

    Product owner: maximizes value and orders the backlog. Scrum master: coaches the process and removes impediments. Developers: build the increment.

  • Card 21Sprint review vs sprint retrospective

    Review: the team and stakeholders inspect the increment. Retrospective: the team inspects how it worked and picks improvements.

  • Card 22Work-in-progress (WIP) limit

    A cap on how many items may sit in a workflow state at once. On a Kanban board it exposes bottlenecks and keeps flow steady.

  • Card 23Burndown vs burnup chart

    Burndown: work remaining over time. Burnup: work completed against a separate total-scope line, so scope changes stay visible.

  • Card 24Definition of done vs acceptance criteria

    Definition of done: the quality bar for every item. Acceptance criteria: the conditions for one specific item.

  • Card 25MoSCoW

    Must have, Should have, Could have, Won’t have this time: four priority groups for a stated release.

  • Card 26MVP vs MMF

    Minimum viable product: the smallest version that tests a hypothesis with real users. Minimum marketable feature: the smallest piece of functionality worth releasing on its own.

  • Card 27Verification vs validation

    Verification: was it built as specified, checked internally. Validation: does it meet the need, confirmed with the customer or stakeholders.

  • Card 28Forward vs backward traceability

    Forward: requirement → design, build and test. Backward: deliverable → the requirement and objective that justify it.

  • Card 29OPA vs EEF

    Organizational process assets: the organization’s own templates, procedures and lessons learned. Enterprise environmental factors: conditions the team does not control, such as regulation, market and culture.

  • Card 30Story points

    A relative, unitless size estimate that folds together effort, complexity and uncertainty. Comparable within one team, meaningless between teams.

Using the deck without fooling yourself

Run the deck in both directions. Reading a definition and naming the term is a different kind of recall from reading the term and producing the definition, and exam questions mostly do the first in disguise: they describe a situation and expect you to recognize which concept it is.

A card you can recite is not yet a card you can apply. Once a card feels easy, test it on the CAPM practice test, where each option carries a note on why it is right or wrong.

Spread the cards across a schedule instead of one long evening. The CAPM study plan pairs each week with its topic pages, and the deck works as a five-minute warm-up before each sitting.

Pairs that get mixed up most

Risk register vs issue log
Uncertain and future goes in the register; happening now goes in the log. See risks, issues and planned responses.
Accountable vs responsible
One person is accountable for a task; several can be responsible for doing it. See the cards on roles, leadership and ethics.
WIP limit vs timebox
Kanban caps work in progress; Scrum caps time. See agile fit and frameworks.
Burnup vs burndown
The burnup draws scope as its own line; on a burndown, added work can hide inside the slope. See iterations, backlog and agile tracking.